DeLapa Remodel
Open Items
October 24, 2025
🔌 Appliances (Scheduled for Nov 4)
- Install cooktop (pending countertop installation)
- Fix misalignment on refrigerator doors
🪚 Cabinets
- Color issue on upper side of “desk” by dining room door
- Shelves at media center
- Spice drawer won’t close with spices in it
- Warming drawer proud to other cabinet faces
- Adjust top two center drawers in small island – they rub when opening
- Install bottom panels for upper cabinets (where lights / receptacles go)
- Final touch up for minor scratches, etc.
🪨 Countertops
- Overlay templates on slabs for review by homeowner – scheduled Nov 27
- Fabrication Timeline
- Aluminum substrate
- Installation schedule
- Marble - Confirm proper dimensions on fabricated pieces (in home)
- Pony wall – adjustments for substrate
- Marble - Install fireplace hearth and surround, pony wall cap and media center
- BBQ - Install outdoor barbeque granite (see missing stack stone)
💡 Electrical
- Outdoor power to shades
- Install receptacle under island sink for garbage disposal
- Reroute critical circuits running to deprecated power panel (not covered by solar); include all appliances and AC on solar side panel
- Bank of switches in dining room misaligned (part on order)
- Install overhead LED lighting above island and wire chandelier; hold on chandelier until countertops installed
- Replace white receptacles with brown (with USB-C) both sides of buffet island
- Install outdoor waterproof receptacle by lights on side of house to match the one on the back of house installed already
- Secure and calk outdoor receptacle by hose bib in back of family room La Cantina
- NEW OUT OF SCOPE: Replace receptacle in outdoor cabinet where BBQ grill was before
- Media center lights (waiting on Imperial to install shelves)
- All under cabinet lights and power outlets (white); waiting on countertops
🏗️ General Construction
- Fix drip edge over trellis in ‘triangle’ roof area
🎨 Painting
- Outdoor house (where stucco was cut)
- Touchup inside, minor on trellis for new covers by vertical column
- Sliding door from family room to living room scratched on family room side
🚰 Plumbing
- Faucets
- Filter
- Garbage disposal (2)
- Gas line
- Outdoor spigot
- Dishwasher
🪵 Woodwork (Donny)
- Baseboard - finalize by fireplace after marble installed
- Bring back excess tambour wood